Upgrading community swimming pools requires technical expertise and regulatory compliance. In this comprehensive project, we breathed new life into a 1970s structure that was in dire need of renovation. The project included the complete sealing and waterproofing of the pool basin , the installation of energy-efficient lighting systems, and full compliance with current health and safety regulations. The result is an efficient, watertight pool , ready to withstand the intensive use of a demanding community.
Rehabilitation of a swimming pool in the attic of an apartment building that had numerous leaks causing dampness and damage in several apartments located below the pool.
Waterproofing of the pool basin and walls, replacing the old one, made with lead.
Creation of a new garden crown made on site.
Restoration of ventilation chimneys of the interior courtyards located inside the pool by making round stone benches.
Underwater lighting installation.
Adaptation of filtration and disinfection to current regulations.
Installation of interior finish, covered with 2.5cm x 2.5cm reviglass PS series tile.
Installation of a staircase for bathers with reduced mobility.